Cloth take up time of wire mesh loom
2023-11-28
Not only the imitation Germany loom with two beating up but also the imitation Japanese loom with one beating up, The correct cloth take-up time shall be the time of beat-up of weft wire because the cloth tension is at the minimum value at the beat-up of weft wire time which is easy to take up the cloth and reduce the workload of the cloth take-up mechanism. If the cloth take-up time is before and after the beat-up of weft wire time, the workload of the cloth take-up mechanism would be increased; at the same time, the tension of the cloth surface is suddenly increased during the cloth take-up action which is easy to cause the plain weaving cloth fork and break.
The height position of the beat-up of weft wire
Sintered mesh filter
Related Article
"CHINAPLAS 2024 International Rubber and Plastics Exhibition" today marks the beginning of the curtain.For four consecutive days (April 23-26).At the National Convention and Exhibition Center (Shanghai).
CHINAPLAS 2024 International Rubber and Plastics Exhibition